|
(Left-Click to maximum the picture; back arrow to return) |
|

Building & Grounds Department
Staff
|

Enfield High Heat Repair, New Year's Eve 2011
|

Enfield High Heat Repair, New Year's Day 2012
|
|

Building & Grounds Department
Crew
|

Installing replacement windows at the EMS Building |

Installing replacement windows at the EMS Building |

Construction of accessible rest room at EHS sports field |

Construction of accessible rest room at EHS sports field |

Sidewalk Replacement at Head Start Daycare |

Installing power to Enfield High Football food trailer |

Installing new economizer at the Senior
Center |

Removing decking at ALAC pool for
replacement |

Installing a PA system at Enfield High School |

2010 4th of July Parade Float |

Installing 4 new furnaces at Old Town Hall |
|

Set of cabinets
being installed at Town Hall.
|

Coil repair at the Police Station
|

Rebuilding the
Power Hollow ball field.
|
|

New Drainage installed at Enfield Street School.
|

Play area built at
the Henry Barnard School.
|

New Village Center Steps.
|